§ 543. Purchase of materials and construction.
(a) Purchase and delivery of materials.--The commission may
purchase and deliver to the appropriate sites the required
amount of wire fencing, staples, insulators, posts or other
material necessary to construct a deer, elk or bear deterrent
fence approved by the commission.
(b) Construction of deer or elk deterrent fences.--
(1) The commission may construct, or may enter into
contracts for the construction of, or enter into a written
agreement with the applicant for the construction of, deer or
elk deterrent fences on sites approved by the commission.
(2) In making application for a deterrent fence under
the provisions of this subsection, the applicant shall agree
to one of the following three fence construction options:
(i) The commission may construct, or may contract
for the construction of, the deterrent fence.
(ii) The applicant may, within six months of
delivery of materials, construct the deterrent fence.
(iii) The applicant may contract with a third party
for the construction of the deterrent fence.
(3) After any deterrent fence is constructed and
approved by the commission under the option specified in
paragraph (2)(i), the commission shall pay for the cost of
installation, and the landowner or lessee shall then
reimburse the commission for 50% of the cost of installation.
(c) Construction of bear deterrent fences.--Prior to
delivery under subsection (a), an applicant for a bear deterrent
fence shall have agreed, in writing, with the commission to
construct the bear deterrent fence without cost to the
commission and to complete construction of the bear deterrent
fence within seven days from the date the material is delivered
to the site. In case the bear deterrent fence is not completed
within the stipulated time, the commission may recover the
materials it furnished at such time and in such manner as
desired or found practical.
(d) Specifications.--All deterrent fences shall be
constructed and installed in accordance with plans and
instructions supplied and approved by the commission.
(e) Reimbursement of applicant for materials.--The
commission may, through prior written agreement with the
applicant, pay the applicant for any or all materials necessary
to construct a deterrent fence within the time limitations set
forth in this section.
(Dec. 17, 1990, P.L.687, No.170, eff. imd.)
Section: Previous 501 502 521 522 523 541 542 543 544 545 546 547 551 552 553 Next