33 USC 2318 - Flood Plain Management

(a) Exclusion of elements from benefit-cost analysis

The Secretary shall not include in the benefit base for justifying Federal flood damage reduction projects—

(1)(A) any new or substantially improved structure (other than a structure necessary for conducting a water-dependent activity) built in the 100-year flood plain with a first floor elevation less than the 100-year flood elevation after July 1, 1991; or

(B) in the case of a county substantially located within the 100-year flood plain, any new or substantially improved structure (other than a structure necessary for conducting a water-dependent activity) built in the 10-year flood plain after July 1, 1991; and

(2) any structure which becomes located in the 100-year flood plain with a first floor elevation less than the 100-year flood elevation or in the 10-year flood plain, as the case may be, by virtue of constrictions placed in the flood plain after July 1, 1991.

(b) Flood damage reduction benefits

(1) In general

In calculating the benefits of a proposed project for nonstructural flood damage reduction, the Secretary shall calculate the benefits of the nonstructural project using methods similar to those used for calculating the benefits of structural projects, including similar treatment in calculating the benefits from losses avoided.

(2) Avoidance of double counting

In carrying out paragraph (1), the Secretary should avoid double counting of benefits.

(c) Counties substantially located within 100-year flood plain

For the purposes of subsection (a) of this section, a county is substantially located within the 100-year flood plain—

(1) if the county is comprised of lands of which 50 percent or more are located in the 100-year flood plain; and

(2) if the Secretary determines that application of the requirement contained in subsection (a)(1)(A) of this section with respect to the county would unreasonably restrain continued economic development or unreasonably limit the availability of needed flood control measures.

(d) Cost sharing

Not later than January 1, 1992, the Secretary shall transmit to Congress a report on the feasibility and advisability of increasing the non-Federal share of costs for new projects in areas where new or substantially improved structures and other constrictions are built or placed in the 100-year flood plain or the 10-year flood plain, as the case may be, after the initial date of the affected governmental unit's entry into the regular program of the national flood insurance program of the National Flood Insurance Act of 1968 [42 U.S.C. 4001 et seq.].

(e) Regulations

Not later than 6 months after the date on which a report is transmitted to Congress under subsection (c) of this section, the Secretary, in consultation with the Director of the Federal Emergency Management Agency, shall issue regulations to implement subsection (a) of this section. Such regulations shall define key terms, such as new or substantially improved structure, constriction, 10-year flood plain, and 100-year flood plain.

(f) Applicability

The provisions of this section shall not apply to any project, or separable element thereof, for which a final report of the Chief of Engineers has been forwarded to the Secretary before the last day of the 6-month period beginning on the date on which regulations are issued pursuant to subsection (a) of this section but not later than July 1, 1993.

(Pub. L. 101–640, title III, §308, Nov. 28, 1990, 104 Stat. 4638; Pub. L. 106–53, title II, §219(a), Aug. 17, 1999, 113 Stat. 294.)

Sections:  Previous  2314  2314a  2315  2316  2317  2317a  2317b  2318  2319  2320  2321  2321a  2322  2323  2323a  Next

Last modified: October 26, 2015