Alaska Statutes Sec. 29.60.440 - Limitation

AS 29.60.400 - 29.60.440 do not require that a recipient of a grant for a feasibility study must proceed with construction of the project, regardless of whether the project is determined to be feasible.

Section: Previous  29.60.400  29.60.410  29.60.420  29.60.430  29.60.440  

Last modified: November 15, 2016