Hawaii Revised Statutes 174c-85 Well Completion Report.

[§174C-85] Well completion report. Within thirty days after the completion of the well, the well driller and pump installation contractor shall file with the commission a written report containing such information prescribed by the commission, including, as appropriate: the depth, thickness, and character of the different strata penetrated and the location of water-bearing strata; the date of completion of the well; the length, size, and weight of the casing and a description of the placement of the casing; the size of the drilled hole; where the well is sealed off; the type of seal; the number of cubic feet per second or gallons per minute of flow from the well; the pressure in pounds per square inch, if a flowing well, and the static water level and water temperature, if a nonflowing well; and a chemical analysis of a water sample drawn from the well. [L 1987, c 45, pt of §2]

Section: Previous  174c-67  174c-68  174c-71  174c-81  174c-82  174c-83  174c-84  174c-85  174c-86  174c-87  174c-91  174c-92  174c-93  174c-94  174c-95  Next

Last modified: October 27, 2016