Nevada Revised Statutes Section 455.110 - Public Health and Safety

Notification of association for operators required; marking proposed area of excavation or demolition; exception.

1. Except as otherwise provided in subsection 2, a person shall not begin an excavation or demolition if the excavation or demolition is to be conducted in an area that is known or reasonably should be known to contain a subsurface installation, except a subsurface installation owned or operated by the person conducting the excavation or demolition, unless he:

(a) Notifies the appropriate association for operators pursuant to NRS 455.120, at least 2 working days but not more than 14 calendar days before excavation or demolition is scheduled to commence. The notification may be written or provided by telephone and must state the name, address and telephone number of the person who is responsible for the excavation or demolition, the starting date of the excavation or demolition, anticipated duration and type of excavation or demolition to be conducted, the specific area of the excavation or demolition and whether explosives are to be used.

(b) Cooperates with the operator in locating and identifying its subsurface installation by:

(1) Meeting with its representative as requested; and

(2) Making a reasonable effort that is consistent with the practice in the industry to mark with white paint, or another method that is agreed to by the operator and the person who is responsible for the excavation or demolition, the proposed area of the excavation or demolition.

2. A person responsible for emergency excavation or demolition is not required to comply with the provisions of subsection 1 if there is a substantial likelihood that loss of life, health or property will result before the provisions of subsection 1 can be fully complied with. The person shall notify the operator of the action he has taken as soon as practicable.

Last modified: February 26, 2006