Oregon Statutes - Chapter 469 - Energy; Conservation Programs; Energy Facilities - Section 469.205 - Application for preliminary certification; eligibility; contents; fees; rules.

(1) Prior to erection, construction, installation or acquisition of a proposed facility, any person may apply to the State Department of Energy for preliminary certification under ORS 469.210 if:

(a) The erection, construction, installation or acquisition of the facility is to be commenced on or after October 3, 1979;

(b) The facility complies with the standards or rules adopted by the Director of the State Department of Energy; and

(c) The applicant meets one of the following criteria:

(A) The applicant is a person to whom a tax credit has been transferred; or

(B) The applicant will be the owner or contract purchaser of the facility at the time of erection, construction, installation or acquisition of the proposed facility, and:

(i) The applicant is the owner, contract purchaser or lessee of a trade or business that plans to utilize the facility in connection with Oregon property; or

(ii) The applicant is the owner, contract purchaser or lessee of a trade or business that plans to lease the facility to a person who will utilize the facility in connection with Oregon property.

(2) An application for preliminary certification shall be made in writing on a form prepared by the department and shall contain:

(a) A statement that the applicant or the lessee of the applicant’s facility:

(A) Intends to convert from a purchased energy source to a renewable energy resource;

(B) Plans to acquire, construct or install a facility that will use a renewable energy resource or solid waste instead of electricity, petroleum or natural gas;

(C) Plans to use a renewable energy resource in the generation of electricity for sale or to replace an existing or proposed use of an existing source of electricity;

(D) Plans to acquire, construct or install a facility that substantially reduces the consumption of purchased energy;

(E) Plans to acquire, construct or install equipment for recycling as defined in ORS 469.185 (11);

(F) Plans to acquire an alternative fuel vehicle or to convert an existing vehicle to an alternative fuel vehicle;

(G) Plans to acquire, construct or install a facility necessary to operate alternative fuel vehicles;

(H) Plans to acquire transit passes for use by individuals specified by the applicant;

(I) Plans to acquire, construct or install a transportation facility;

(J) Plans to acquire a sustainable building practices facility;

(K) Plans to acquire a car sharing facility and operate a car sharing program;

(L) Plans to construct a high-efficiency combined heat and power facility;

(M) Is a homebuilder and plans to construct a homebuilder-installed renewable energy system;

(N) Is a homebuilder and plans to construct a high-performance home; or

(O) Plans to acquire, construct or install a renewable energy resource equipment manufacturing facility.

(b) A detailed description of the proposed facility and its operation and information showing that the facility will operate as represented in the application.

(c) Information on the amount by which consumption of electricity, petroleum or natural gas by the applicant or the lessee of the applicant’s facility will be reduced, and on the amount of energy that will be produced for sale, as the result of using the facility or, if applicable, information about the expected level of sustainable building practices facility performance.

(d) The projected cost of the facility.

(e) If applicable, a copy of the proposed qualified transit pass contract, transportation services contract or contract for lease of parking spaces for a car sharing facility.

(f) Any other information the director considers necessary to determine whether the proposed facility is in accordance with the provisions of ORS 469.185 to 469.225, and any applicable rules or standards adopted by the director.

(3) An application for preliminary certification shall be accompanied by a fee established under ORS 469.217. The director may refund the fee if the application for certification is rejected.

(4) The director may allow an applicant to file the preliminary application after the start of erection, construction, installation or acquisition of the facility if the director finds:

(a) Filing the application before the start of erection, construction, installation or acquisition is inappropriate because special circumstances render filing earlier unreasonable; and

(b) The facility would otherwise qualify for tax credit certification pursuant to ORS 469.185 to 469.225.

(5) A preliminary certification of a sustainable building practices facility shall be applied for and issued as prescribed by the department by rule. [1979 c.512 §6; 1981 c.894 §19; 1985 c.745 §4; 1989 c.765 §7; 1991 c.711 §2; 1993 c.684 §3; 1995 c.746 §16; 1997 c.656 §7; 1999 c.623 §5; 1999 c.765 §5; 2001 c.583 §5; 2001 c.660 §2; 2003 c.186 §24; 2007 c.843 §18]

Note: See note under 469.185.

Section:  Previous  469.176  469.180  469.185  469.190  469.195  469.197  469.200  469.205  469.206  469.207  469.208  469.210  469.215  469.217  469.220  Next

Last modified: August 7, 2008