2 USC 1816a - Design-build Contracts

(a) Notwithstanding any other provision of law, the Architect of the Capitol may use the two-phase selection procedures authorized in section 3309 of title 41 for entering into a contract for the design and construction of a public building, facility, or work in the same manner and under the same terms and conditions as the head of an executive agency under such section.

(b) This section shall apply with respect to fiscal year 2008 and each succeeding fiscal year.

(Pub. L. 110–161, div. H, title I, §1308, Dec. 26, 2007, 121 Stat. 2244.)

Sections:  Previous  1805  1808  1811  1812  1813  1814  1816  1816a  1816b  1817  1817a  1818  1819  1821  1822  Next

Last modified: October 26, 2015