42 USC 8353 - General Requirements for Exemptions

(a) Use of mixtures or fluidized bed combustion not feasible

Except in the case of an exemption under section 8352(b), (f), or (i) of this title, the Secretary may grant a permanent exemption for a powerplant under this part only—

(1) if the applicant has demonstrated that the use of a mixture of natural gas or petroleum and coal (or other alternate fuels), for which an exemption under section 8352(b) of this title would be available, is not economically or technically feasible; and

(2) if the Secretary has not made a finding that the use of a method of fluidized bed combustion of coal or an alternate fuel is economically and technically feasible.

(b) No alternative power supply in case of a powerplant

(1) In the case of an exemption under section 8352(b) or (g) of this title, the Secretary may not grant an exemption for an existing powerplant unless he finds that the petitioner has demonstrated that there is no alternative supply of electric power which is available within a reasonable distance at a reasonable cost without impairing short-run or long-run reliability of service and which can be obtained by the petitioner, despite reasonable good faith efforts.

(2) The Secretary shall forward a copy of any such petition to the Federal Energy Regulatory Commission promptly after it is filed with the Secretary and shall consult with the Commission before making any finding on such petition under paragraph (l).

(Pub. L. 95–620, title III, §313, Nov. 9, 1978, 92 Stat. 3313; Pub. L. 100–42, §1(c)(10), (13), May 21, 1987, 101 Stat. 313.)

Sections:  Previous  8322  8323  8324  8341  8343  8351  8352  8353  8354  8373  8374  8401  8401a  8402  8411  Next

Last modified: October 26, 2015