Revised Code of Washington - RCW Title 85 Diking And Drainage - Section 85.16.150 Approval of schedules -- Separate funds for diking, drainage systems

§ 85.16.150. Approval of schedules -- Separate funds for diking, drainage systems

When the board shall have determined that the schedule or schedules of benefits and/or apportionment of costs as filed or as changed and modified by it are fair, just and equitable and, if estimated costs have been apportioned, that said benefits equal or exceed said costs apportioned, the members of the board approving the same shall sign said schedule or schedules and cause the clerk of the board to attest their signatures under his seal, and shall enter an order in the journal approving and confirming the final determination of such benefits and apportionment of costs and all proceedings leading thereto and in connection therewith. If separate schedules be established for maintenance of the diking system and of the drainage system, the board shall by order establish two separate maintenance funds, one for the maintenance of the diking system and one for the maintenance of the drainage system.

[1949 c 26 § 10; Rem. Supp. 1949 § 4459-29.]

Sections:  Previous  85.16.070  85.16.080  85.16.090  85.16.110  85.16.115  85.16.120  85.16.130  85.16.150  85.16.160  85.16.170  85.16.180  85.16.190  85.16.200  85.16.210  85.16.220  Next

Last modified: April 7, 2009