Revised Code of Washington - RCW Title 86 Flood Control - Section 86.26.105 Comprehensive flood control management plan -- Requirements -- Time for completion

§ 86.26.105. Comprehensive flood control management plan -- Requirements -- Time for completion

A comprehensive flood control management plan shall determine the need for flood control work, consider alternatives to in-stream flood control work, identify and consider potential impacts of in-stream flood control work on the state's in-stream resources, and identify the river's meander belt or floodway. A comprehensive flood control management plan shall be completed and adopted within at least three years of the certification that it is being prepared, as provided in RCW 86.26.050.

If after this three-year period has elapsed such a comprehensive flood control plan has not been completed and adopted, grants for flood control maintenance projects shall not be made to the county or municipal corporations in the county until a comprehensive flood control plan is completed and adopted by the appropriate local authority. These limitations on grants shall not preclude allocations for emergency purposes made pursuant to RCW 86.26.060.

[1986 c 46 § 5; 1984 c 212 § 9.]

Sections:  Previous  86.26.005  86.26.007  86.26.010  86.26.040  86.26.050  86.26.060  86.26.070  86.26.080  86.26.090  86.26.100  86.26.105

Last modified: April 7, 2009