Revised Code of Washington - RCW Title 47 Public Highways And Transportation - Section 47.56.120 Toll bridges -- Construction directed -- Costs

§ 47.56.120. Toll bridges -- Construction directed -- Costs

In the event that any toll bridge should be constructed, all cost thereof including right-of-way, survey, and engineering shall be paid out of any funds available for payment of the cost of such toll bridge under this chapter.

[2008 c 122 § 13; 1977 ex.s. c 151 § 70; 1961 c 13 § 47.56.120. Prior: 1937 c 173 § 4; RRS § 6524-4.]

Sections:  Previous  47.56.075  47.56.076  47.56.077  47.56.078  47.56.090  47.56.100  47.56.110  47.56.120  47.56.130  47.56.140  47.56.150  47.56.160  47.56.165  47.56.167  47.56.170  Next

Last modified: April 7, 2009