Revised Code of Washington - RCW Title 17 Weeds, Rodents, And Pests - Section 17.10.280 Lien for labor, material, equipment used in controlling noxious weeds

§ 17.10.280. Lien for labor, material, equipment used in controlling noxious weeds

Every activated county noxious weed control board performing labor, furnishing material, or renting, leasing or otherwise supplying equipment, to be used in the control of noxious weeds, or in causing control of noxious weeds, upon any property pursuant to the provisions of chapter 17.10 RCW has a lien upon such property for the labor performed, material furnished, or equipment supplied whether performed, furnished, or supplied with the consent of the owner, or his agent, of such property, or without the consent of said owner or agent.

[1987 c 438 § 35; 1975 1st ex.s. c 13 § 13.]

Sections:  Previous  17.10.210  17.10.230  17.10.235  17.10.240  17.10.250  17.10.260  17.10.270  17.10.280  17.10.290  17.10.300  17.10.310  17.10.350  17.10.890  17.10.900  17.10.910  Next

Last modified: April 7, 2009