(a) Each company employing a special inspector shall, within 30 days following each inspection for certification as required by AS 18.60.390 for a boiler or unfired pressure vessel, file a report of the inspection with the Department of Labor and Workforce Development upon forms adopted by the department.
(b) In addition, a special inspector shall file with the department a report of an inspection that discloses a condition dangerous to life or property in a boiler or unfired pressure vessel.
Section: Previous 18.60.210 18.60.220 18.60.230 18.60.235 18.60.240 18.60.250 18.60.260 18.60.270 18.60.280 18.60.290 18.60.300 18.60.310 18.60.315 18.60.320 18.60.330 NextLast modified: November 15, 2016