Design standards, rights-of-way, and widths for each local service road and trail project must have the prior approval of the commissioner, unless the project is under the supervision of a local government that has assumed local road powers. Where approval is required the commissioner must make a decision within 90 days after the Department of Transportation and Public Facilities' receipt of the local government's request. If the project is under the supervision of a local government that has assumed road powers and the project is not located on a federal-aid secondary route, design standards, rights-of-way, and widths shall be established by the local government. If a project under the supervision of a local government that has assumed road powers is located on a federal-aid secondary route, design standards, rights-of-way, and widths must have the prior approval of the commissioner.
Section: Previous 19.30.130 19.30.131 19.30.140 19.30.141 19.30.150 19.30.151 19.30.160 19.30.161 19.30.170 19.30.171 19.30.181 19.30.191 19.30.201 19.30.211 19.30.221 NextLast modified: November 15, 2016