AS 29.60.400 - 29.60.440 do not require that a recipient of a grant for a feasibility study must proceed with construction of the project, regardless of whether the project is determined to be feasible.
Section: Previous 29.60.400 29.60.410 29.60.420 29.60.430 29.60.440Last modified: November 15, 2016