(a) A person who claims a lien under AS 34.35.245 must record, within 90 days from the cutting of the timber, a claim with the recorder of the recording district in which the saw timber is cut.
(b) The claim must be in substance the same as provided in AS 34.35.240 and must be verified as provided in that section.
Section: Previous 34.35.230 34.35.235 34.35.240 34.35.245 34.35.250 34.35.255 34.35.260 34.35.265 34.35.270 34.35.275 34.35.280 34.35.285 34.35.290 34.35.295 34.35.300 NextLast modified: November 15, 2016