A subcontract that is performed on public construction may be reduced to a basis of day labor for the purpose of determining whether or not the subcontractor or contractors have paid at not less than the prevailing scale of wage.
Section: Previous 36.05.005 36.05.010 36.05.020 36.05.030 36.05.035 36.05.040 36.05.045 36.05.050 36.05.060 36.05.070 36.05.080 36.05.090 36.05.110 36.05.120 NextLast modified: November 15, 2016