The owner of a construction project that will require excavation shall indicate in bid documents or contracts for construction the existence of underground facilities that the project owner knows are located inside of the proposed area of excavation. This requirement does not release the excavator from the excavator's responsibility under AS 42.30.400 - 42.30.490.
Section: Previous 42.30.400 42.30.410 42.30.420 42.30.430 42.30.440 42.30.450 42.30.460 42.30.490 NextLast modified: November 15, 2016