30-126. Designation of transmission lines upon which uniform transmission voltage rate applicable
The authority shall designate certain sections of main transmission lines and facilities in the state for delivery of Colorado river power, including lines to be constructed or acquired by the authority and any transmission lines and facilities which may become available through the United States or an agency thereof, or other public or private sources, to the extent that the authority may be able to arrange for the use of the lines and facilities, as to which sections a uniform rate for power at transmission voltage shall also be made applicable. The sections shall initially include all portions of the lines between the points of generation on the Colorado river and distribution centers where substantial power loads exist as established by the authority.
Section: Previous 30-109 30-121 30-122 30-123 30-123.01 30-124 30-125 30-126 30-127 30-127.01 30-128 30-129 30-151 30-152 30-153 NextLast modified: October 13, 2016