(a) (1) The Commission on Water Well Construction shall issue rig permits if the contractor has:
(A) A valid license;
(B) Made proper application for a rig permit; and
(C) Paid the required fee.
(2) Rig permits shall not be transferable and shall expire July 31 of each year.
(b) (1) (A) The contractor must renew the rig permit annually by applying no later than thirty (30) days after the expiration date and paying the required fee.
(B) After receiving the renewal materials and fee, the commission shall extend the validity of the current rig permit until the contractor receives:
(i) The new rig permit; or
(ii) Notice that the commission has refused to renew the rig permit.
(2) After August 31 of each year, the commission shall only renew a rig permit upon application and payment of the applicable fee plus a penalty of twenty-five dollars ($25.00).
(c) (1) No water well contractor shall operate a rig or permit an employee to operate a rig unless the contractor holds a valid rig permit issued by the commission.
(2) The contractor shall obtain a separate permit for each rig operated by the contractor during the permit year.
(d) (1) The commission shall issue permits composed of weatherproof material.
(2) The contractor shall firmly and conspicuously attach the permit to the rig for which it was issued.