Appeal No. 96-1599 Application 07/968,421 . . . By means of the workpiece position estimation device, the position of each workpiece on the line is estimated based on the flow sequence data for each workpiece collected at specified positions on the line, workpiece passage timing data, and process plan data. Then, based on the positions of each workpiece on the line, which have been estimated by this workpiece position estimation device, the arrival time of each workpiece to a process requiring initial setup work is calculated by means of an arrival time calculation device. The timing of operation start instructions, part supply instructions, etc. for the initial setup work corresponding to each workpiece is then determined by an instruction timing determination device based on the arrival time of each workpiece thus calculated, and the operation start instructions, part supply instructions, etc. are performed for the initial setup processing in the timing determined thereby [translation, pages 5 and 6]. Given the disclosure of Hatano, the examiner contends that “one having ordinary skill in the art would have found it obvious to determine any obvious operation starting command in accordance with any obvious parameter of the pieces to be assembled” (answer, Paper No. 27, page 2). More specifically, the examiner states that Hatano fails to literally disclose that a preset 4Page: Previous 1 2 3 4 5 6 7 8 NextLast modified: November 3, 2007