Ex parte BLAHNIK et al. - Page 4


                    Appeal No. 2000-0402                                                                                                      
                    Application 08/720,399                                                                                                    

                    workstation coupled to the production staging area, the release workstation operated by a                                 

                    release user, the release user being able to determine an effective date of the approved control                          

                    software, the release workstation being adapted to copy the approved control software from                                

                    the pre-production repository to a production repository located at the production staging area                           

                    on the effective date; a production workstation coupled to the production staging area for                                

                    receiving the order for a production machine, determining the subset of electronic control                                

                    modules located on the ordered production machine, and retrieving the production control                                  

                    software corresponding to the subset of electronic control modules located on the ordered                                 

                    production machine, the production workstation being coupled to the ordered production                                    

                    machine and adapted to download the production control software from the production staging                               

                    area to the subset of electronic control modules located on the ordered production machine and                            

                    a production staging area coupled to the product engineering workstation for receiving and                                

                    storing approved production control software and for receiving an order for a production                                  

                    machine in a build schedule staging area.                                                                                 

                             The examiner further identifies Moore-McKee as teaching a method of operating a                                  

                    computer to automatically produce control software for an information manager on earth moving                             

                    machines.                                                                                                                 

                             Finally, the examiner concludes that it would have been obvious to modify the teachings                          

                    of Oba with the teachings of Beasley and Moore-McKee because this modification would                                      

                    provide Oba’s teaching with the enhanced capability of processing a product efficiently while                             




                                                                      4                                                                       



Page:  Previous  1  2  3  4  5  6  7  8  Next 

Last modified: November 3, 2007