Ex parte LINDSTROM et al. - Page 2




          Appeal No. 1999-0086                                                        
          Application No. 08/612,820                                                  


          production run speed of a sheet fabrication machine in which                
          historical data pertaining to machine positioning parameters                
          is  collected and stored in a database in machine memory.                   
          This historical data is retrieved from the database and                     
          utilized by the system controller to calculate the maximum                  
          allowable speed for each machine positioning move.                          
               Claim 1 is illustrative of the invention and reads as                  
          follows:                                                                    
          1.  A method of producing parts from a worksheet in at least                
          one sheet fabrication machine comprising the steps of:                      
               (a) determining a number of parameters which affect each               
          positioning move by said machine to produce each part from                  
          said worksheet;                                                             
               (b) storing in a memory means available for said machine               
          historical data indicative of how each of said parameters                   
          affects the accuracy of said each part produced from said                   
          worksheet by said machine;                                                  
               (c) inputting parameter values based on said stored                    
          historical data to a processor means of said machine to                     
          calculate positioning parameters providing for maximum                      
          allowable speed for said each positioning move by said machine              
          to produce said each part from said worksheet; and                          
               (d) utilizing said calculated positioning parameters for               
          said each positioning move to optimize the minimum safe                     
          positioning time for said each positioning move so that each                
          part is produced with the requisite accuracy from said                      
          worksheet at the fastest allowable production speed.                        
               The Examiner relies on the following prior art:                        
                                          2                                           





Page:  Previous  1  2  3  4  5  6  7  8  9  10  11  12  13  14  Next 

Last modified: November 3, 2007