                  1.  A method for controlling the pressure at the base of a gas-lifted riser during                                                      
                  drillling of an offshore well, said method comprising the steps of:                                                                     
                  determining the rider base pressure (prb); and                                                                                          
                  using a throttling device located at or near the top of said riser to adjust the mass                                                   
                  flow rate out of the top of said riser (mo) and the riser surface pressure (prs)                                                        
                  to compensate for changes in the riser base pressure (prb).                                                                             
                  12.  A method for controlling the pressure at the base of a gas-lifted riser during                                                     
                  drilling of an offshore well, said method comprising the steps of:                                                                      
                  determining a setpoint value for riser mix density (pmix);                                                                              
                  determining the actual value of riser mix density (pmix);                                                                               
                  adjusting one or both of the boost mud flow rate (qb) and the lift gas flow rate (qb)                                                   
                  to substantially minimize the difference between said setpoint value and said actual                                                    
                  value.                                                                                                                                  
                  13.  The method of claim 12, wherein said method further comprises the steps                                                            
                  of:                                                                                                                                     
                  determining well return flow rate (qw) and drill string flow rate (qc); and                                                             
                  comparing the drill string flow rate (qc) to the well return flow rate (qw) to detect well                                              
                  control problems such as kickers or lost circulation.                                                                                   