“Removal action work plan” means a work plan prepared or approved by the department or a California regional water quality control board that is developed to carry out a removal action, in an effective manner, that is protective of the public health and safety and the environment. The removal action work plan shall include a detailed engineering plan for conducting the removal action, a description of the onsite contamination, the goals to be achieved by the removal action, and any alternative removal options that were considered and rejected and the basis for that rejection.
(Repealed and added by Stats. 1999, Ch. 23, Sec. 2. Effective May 26, 1999.)
Last modified: October 25, 2018