When gathering and stacking temporary floor planks from the last panel, the steel erector’s personnel assigned to such work shall be protected by safety belts with life lines attached to a catenary line or other substantial anchorage.
(Added by Stats. 1970, Ch. 1498.)
Last modified: October 25, 2018