California Labor Code CHAPTER 3 - Operation of Tanks and Boilers
- Section 7680.
No tank or boiler shall be operated unless a permit for its operation has been issued by or in behalf of the division.(Amended by Stats....
- Section 7681.
(a) The division shall inspect or cause to be inspected each installed tank at least every five years, except for any tank specified in subdivision (b).(b) Any...
- Section 7682.
The division shall inspect or cause to be inspected each installed fired boiler internally and externally at least every year, except that the division may...
- Section 7683.
(a) If a tank or boiler is found to be in a safe condition for operation, a permit shall be issued by or on behalf of...
- Section 7684.
Each permit or a clear reproduced copy thereof shall be posted in a protective container in a conspicuous place on or near the tank or...
- Section 7685.
The division may issue and renew temporary permits for not to exceed 30 days each, pending the making of replacements or repairs.(Added by Stats. 1945,...
- Section 7686.
Upon good cause being shown therefor, and after notice and an opportunity to be heard, the division may revoke any permit.(Added by Stats. 1945, Ch.
- Section 7687.
If the inspection shows a tank or boiler to be in an unsafe or dangerous condition, the division may issue a preliminary order requiring such...
- Section 7688.
Unless the preliminary order is complied with, a hearing before the division shall be allowed, upon request, at which the owner, operator, or other person...
- Section 7689.
If it thereafter appears to the division that the tank or boiler is unsafe and that the requirements contained in the preliminary order should be...
- Section 7690.
The order may be reheard by the division, or reviewed by the courts, in the manner specified by this code for safety orders, and not...
- Section 7691.
If the operation of a tank or boiler constitutes a serious menace to the life or safety of any person employed about it, the division...
- Section 7692.
The certification of the division that no valid permit exists for the operation of a tank or boiler, and the affidavit of any safety engineer...
Last modified: October 22, 2018