California Public Utilities Code ARTICLE 2 - Interconnection of Facilities

  • Section 2811.
    In order to promote the more efficient use and distribution of natural gas or electric energy and eliminate the necessity for construction of transmission facilities...
  • Section 2812.
    Upon application of a private energy producer, and after notice to any affected public utility and hearing thereon, the commission shall authorize such producer to...
  • Section 2812.5.
    Upon application of a private energy producer, and after notice to any affected public utility and hearing thereon, the commission shall authorize such producer to...
  • Section 2813.
    The private energy producer shall be required to provide and to pay the total cost of the interconnection as well as any costs associated with...
  • Section 2815.
    Nothing in this chapter shall require that any private energy producer perform any service or deliver any commodity to the public or any portion thereof,...
  • Section 2816.
    Every public utility shall keep accurate records of transactions with a private energy producer, and of the use of the public utility’s facilities by the...