California Water Code ARTICLE 4 - Collection
- Section 75610.
The district, after the levying of the ground water charge, shall give notice thereof to each operator of each water-producing facility in the zone or...
- Section 75611.
After the establishment of a ground water charge, each operator of a water-producing facility within the affected zone or zones of the district, until such...
- Section 75612.
If no water has been produced from a water-producing facility during the preceding six-month period, a statement shall be filed with the district, setting forth...
- Section 75613.
The ground water charge is payable to the district on or before the last date upon which the water production statement is required to be...
- Section 75614.
Whenever any water-producing facility in an affected zone is permanently abandoned, the operator thereof shall give written notice of such abandonment to the district.(Added by...
- Section 75615.
If any operator of a water-producing facility fails to pay the ground water charge when due, the district shall charge interest at the rate of...
- Section 75616.
If any operator of a water-producing facility fails to register the water-producing facility, or fails to file the water production statements as required by this...
- Section 75617.
The board may, at the time of fixing the ground water charge, establish a method or methods to be used in computing the amount of...
- Section 75618.
Upon good cause shown, an amended statement of water production may be filed or a correction of the records may be made at any time...
- Section 75619.
If the district has probable cause to believe that the production of water from any water-producing facility is in excess of that disclosed by the...
- Section 75620.
After the determination has been made by the district pursuant to Section 75619, a written notice thereof shall be mailed to the person operating the...
- Section 75621.
A determination made by the district pursuant to Section 75619 shall be conclusive on all persons having an interest in the water-producing facility involved, and...
- Section 75622.
Upon the filing of a protest, the board shall hold a hearing, at which time the total amount of the water production and the ground...
- Section 75623.
A notice of the hearing shall be mailed to the protestant at least 10 days before the date fixed for the hearing.Notice of the determination...
- Section 75624.
Notice as required in Sections 75620 and 75623 shall be given by deposit thereof in any postal facility regularly maintained by the government of the...
Last modified: October 22, 2018