86.031 Before breach.—A contract may be construed either before or after there has been a breach of it.
History.—s. 3, ch. 21820, 1943; s. 38, ch. 67-254.
Note.—Former s. 87.03.
Section: Previous 86.011 86.021 86.031 86.041 86.051 86.061 86.071 86.081 86.091 86.101 86.111 NextLast modified: September 23, 2016