381.0066 Onsite sewage treatment and disposal systems; fees.—
(1) The department may collect fees for services provided with respect to onsite sewage treatment and disposal systems. The total fees assessed under this section must be sufficient to meet the cost of administering this section and ss. 381.0065 and 381.00655.
(2) The minimum fees in the following fee schedule apply until changed by rule by the department within the following limits:
(a) Application review, permit issuance, or system inspection, including repair of a subsurface, mound, filled, or other alternative system or permitting of an abandoned system: a fee of not less than $25, or more than $125.
(b) Site evaluation, site reevaluation, evaluation of a system previously in use, or a per annum septage disposal site evaluation: a fee of not less than $40, or more than $115.
(c) Biennial operating permit for aerobic treatment units or performance-based treatment systems: a fee of not more than $100.
(d) Annual operating permit for systems located in areas zoned for industrial manufacturing or equivalent uses or where the system is expected to receive wastewater which is not domestic in nature: a fee of not less than $150, or more than $300.
(e) Innovative technology: a fee not to exceed $25,000.
(f) Septage disposal service, septage stabilization facility, portable or temporary toilet service, tank manufacturer inspection: a fee of not less than $25, or more than $200, per year.
(g) Application for variance: a fee of not less than $150, or more than $300.
(h) Annual operating permit for waterless, incinerating, or organic waste composting toilets: a fee of not less than $15, or more than $30.
(i) Aerobic treatment unit or performance-based treatment system maintenance entity permit: a fee of not less than $25, or more than $150, per year.
(j) Reinspection fee per visit for site inspection after system construction approval or for noncompliant system installation per site visit: a fee of not less than $25, or more than $100.
(k) Research: An additional $5 fee shall be added to each new system construction permit issued to be used to fund onsite sewage treatment and disposal system research, demonstration, and training projects. Five dollars from any repair permit fee collected under this section shall be used for funding the hands-on training centers described in s. 381.0065(3)(j).
(l) Annual operating permit, including annual inspection and any required sampling and laboratory analysis of effluent, for an engineer-designed performance-based system: a fee of not less than $150, or more than $300.
The funds collected pursuant to this subsection must be deposited in a trust fund administered by the department, to be used for the purposes stated in this section and ss. 381.0065 and 381.00655.
History.—ss. 44, 46, ch. 83-310; s. 39, ch. 85-81; s. 2, ch. 88-89; s. 27, ch. 91-297; ss. 3, 10, 11, ch. 93-151; ss. 2, 3, ch. 96-303; s. 2, ch. 99-395; s. 2, ch. 2001-234; s. 16, ch. 2002-402; s. 24, ch. 2003-399; s. 2, ch. 2004-245; ss. 10, 76, ch. 2004-269; s. 8, ch. 2004-350; s. 37, ch. 2010-205; s. 35, ch. 2012-184.
Note.—Former s. 381.273.
Section: Previous 381.0061 381.0062 381.0063 381.0064 381.0065 381.00651 381.00655 381.0066 381.0067 381.0068 381.0072 381.0075 381.00771 381.00773 381.00775 NextLast modified: September 23, 2016