479.313 Permit revocation and cancellation; cost of removal.—All costs incurred by the department in connection with the removal of a sign located within a controlled area adjacent to the State Highway System, interstate highway system, or federal-aid primary highway system following the revocation or cancellation of the permit for such sign shall be assessed against and collected from the permittee.
History.—s. 43, ch. 2010-225; s. 23, ch. 2014-215; s. 44, ch. 2014-223.
Section: Previous 479.310 479.311 479.312 479.313 479.315 NextLast modified: September 23, 2016