(605 ILCS 5/9-107) (from Ch. 121, par. 9-107)
Sec. 9-107. Whenever the highway authorities are about to lay a tile drain along any public highway the highway authorities may contract with the owners or occupants of adjoining lands to lay larger tile than would be necessary to drain the highway, and permit connection therewith by such contracting parties to drain their lands.
(Source: P.A. 94-59, eff. 6-17-05.)
Sections: Previous 9-101.1 9-101.5 9-102 9-103 9-104 9-105 9-106 9-107 9-108 9-109 9-110 9-111 9-111.1 9-112 9-112.1 Next
Last modified: February 18, 2015