Section 75F. Any natural gas pipe line company which lays pipes or other underground equipment or structures, or repairs or alters the same, on any land on which it does not have a fee or a binding agreement with the landowner, shall within sixty days after laying such pipes, equipment or structures, or making such repairs or alterations, restore the ground surface to a condition reasonably consistent with its condition before construction, repair or alteration, and any failure to comply with the provisions hereof shall be punishable by a fine of not more than one hundred dollars for each day of failure to so comply.
Section: Previous 74 75 75A 75B 75C 75D 75E 75F 75G 75H 76 76A 76B 76C 76D NextLast modified: September 11, 2015