Section 33C. When it is necessary for the director of the division of water pollution to take the action referred to in section thirty-three B, said director may, with the approval of the water resources commission, contract for engineering reports or final plans from existing bond issues.
Section: Previous 30 30A 31 32 33 33A 33B 33C 33D 33E 34 34A 34B 34C 35 NextLast modified: September 11, 2015