Michigan Compiled Laws § 324.63522 Determination Of Probable Hydrologic Consequences And Statement Of Boring Or Sampling Results; Performance; Cost.


324.63522 Determination of probable hydrologic consequences and statement of boring or sampling results; performance; cost.

Sec. 63522.

If the department finds that the probable total annual production at all locations of a surface coal mining operator will not exceed 100,000 tons, the determination of probable hydrologic consequences and statement of the results of test borings or core samplings required by section 63516, on the written request of the operator, shall be performed by a qualified governmental agency or private consultant designated by the department, and the cost of the preparation of the determination and statement shall be assumed by the department.


History: Add. 1995, Act 57, Imd. Eff. May 24, 1995
Popular Name: Act 451
Popular Name: NREPA


Section: Previous  324.63514  324.63515  324.63516  324.63517  324.63518  324.63519  324.63520  324.63521  324.63522  324.63523  324.63524  324.63525  324.63526    Next

Last modified: October 10, 2016