Nevada Revised Statutes Section 704.070 - Energy - Public Utilities

Public utility required to file current schedules with Commission and to post current schedules at certain offices; public inspection of current schedules. Unless exempt under the provisions of NRS 704.075, 704.095 or 704.097:

1. Each public utility shall file with the Commission, within a time to be fixed by the Commission, a copy of all schedules that are currently in force for the public utility. Such schedules must be open to public inspection.

2. A copy of each schedule that is currently in force for the public utility, or so much of the schedule as the Commission deems necessary for inspection by the public, must be:

(a) Printed in plain type and posted in each office of the public utility where payments are made to the public utility by its customers; and

(b) Open to inspection by the public and in such form and place as to be readily accessible to and conveniently inspected by the public.

Last modified: February 26, 2006