Installation of water meters required by certain residential buildings; exceptions. [Effective when certain conditions concerning agreement between Sierra Pacific Power Company and Pyramid Lake Paiute Tribe have been met.]
1. Every newly constructed residential building which is occupied for the first time after July 1, 1988, must be equipped with a water meter.
2. Subsection 1 does not apply to cities and towns owning and operating municipal waterworks, or to cities and towns located in a county whose population is 400,000 or more.
Last modified: February 26, 2006