Standards; utility prohibited from requiring certain customer-generators to meet additional requirements.
1. A net metering system used by a customer-generator must meet all applicable safety and power quality standards established by:
(a) The National Electrical Code;
(b) Underwriters Laboratories Inc.; and
(c) The Institute of Electrical and Electronic Engineers.
2. A customer-generator whose net metering system meets such safety and quality standards must not be required by the utility to:
(a) Comply with additional standards or requirements;
(b) Perform additional tests;
(c) Install additional controls; or
(d) Purchase additional liability insurance,
Ê arising solely from his status as a customer-generator.