48:12-37. Relocating route before construction
Any portion of the route of a railroad company may be relocated before construction and after filing of the original survey, by filing and recording an amended survey thereof in the same manner as the original survey.
Section: Previous 48-12-31 48-12-32 48-12-32.1 48-12-33 48-12-34 48-12-35.1 48-12-36 48-12-37 48-12-38 48-12-39 48-12-40 48-12-40.1 48-12-40.2 48-12-41 48-12-42 Next
Last modified: October 11, 2016