Where construction, location or relocation is proposed to be done upon a residence, place of business or place of public assembly, no permit required for electrical, plumbing, heating, air conditioning or other construction, location or relocation activity under any provision of general or special law shall be issued until an authorization for wastewater system construction has been issued under G.S. 130A-336 or authorization has been obtained under G.S. 130A-337(c). (1973, c. 452, s. 7; 1981, c. 949, s. 3; 1983, c. 891, s. 2; 1995, c. 285, s. 1.)
Sections: Previous 130A-329 130A-333 130A-334 130A-335 130A-335.1 130A-336 130A-337 130A-338 130A-339 130A-340 130A-341 130A-342 130A-343 130A-343.1 130A-352 Next
Last modified: March 23, 2014