When a flood event affects a manufactured home park, the operator of the manufactured home park, in accordance with rules adopted under section 4781.26 of the Revised Code, shall notify the manufactured homes commission and the board of health having jurisdiction where the flood event occurred within forty-eight hours after the end of the flood event. The commission, after receiving notification, shall immediately notify the board of health.
After being notified of such a flood event , the board of health shall cause an inspection to be made of the manufactured home park named in the notice. The board of health shall issue a report of the inspection to the commission within ten days after the inspection is completed.
Renumbered from § 3733.024 and amended by 129th General AssemblyFile No.127, HB 487, §101.01, eff. 9/10/2012.
Effective Date: 11-05-1992
Section: Previous 4781.27 4781.28 4781.29 4781.30 4781.301 4781.31 4781.32 4781.33 4781.34 4781.35 4781.36 4781.37 4781.38 4781.39 4781.40 NextLast modified: October 10, 2016