If the company operating a railroad neglects or without good cause fails to make the repairs or reconstruction prescribed by the public utilities commission within the time limited by it under section 4907.44 and 4907.45 of the Revised Code, such company shall forfeit to the state one hundred dollars for each day that such repairs or reconstruction is delayed beyond the time prescribed.
Effective Date: 10-01-1953
Section: Previous 4907.39 4907.40 4907.41 4907.42 4907.43 4907.44 4907.45 4907.46 4907.47 4907.471 4907.472 4907.473 4907.474 4907.475 4907.476 NextLast modified: October 10, 2016