Except as provided in sections 4913.171 and 4913.19 of the Revised Code, the public utilities commission shall impose every recommendation made under section 4913.15 or 4913.16 of the Revised Code by the underground technical committee.
Added by 130th General Assembly File No. TBD, SB 378, ยง1, eff. 3/23/2015.
Section: Previous 4913.15 4913.151 4913.152 4913.16 4913.17 4913.19 4913.20 4913.21 4913.22 4913.23 4913.25 4913.171 4913.251 4913.252 4913.26 NextLast modified: October 10, 2016