The public utilities commission shall conduct a study to review the condition of reactive power in the state. The commission shall issue a report of its findings to the general assembly not later than one year after the effective date of this section.
Added by 128th General AssemblyFile No.48, SB 232, ยง1, eff. 6/17/2010.
Section: Previous 4935.01 4935.02 4935.03 4935.04 4935.10Last modified: October 10, 2016