Ohio Revised Code § 4935.10 - Study To Review The Condition Of Reactive Power.

The public utilities commission shall conduct a study to review the condition of reactive power in the state. The commission shall issue a report of its findings to the general assembly not later than one year after the effective date of this section.

Added by 128th General AssemblyFile No.48, SB 232, ยง1, eff. 6/17/2010.

Section: Previous  4935.01  4935.02  4935.03  4935.04  4935.10  

Last modified: October 10, 2016