Each city which owns and operates an electric light and power system or which distributes electric energy for hire, shall charge such rates therefor as meet the requirements of ORS 225.220 to 225.300.
Section: Previous 225.085 225.110 225.120 225.130 225.140 225.150 225.160 225.210 225.220 225.230 225.240 225.250 225.260 225.270 225.280 NextLast modified: August 7, 2008