In the event production on the leasehold shall cease at any time or from time to time, before or after the expiration of the primary term of the lease, the lease shall nevertheless continue in full force and effect if the lessee shall, within six months after the cessation of production or within such longer period of time as the Department of State Lands may authorize, commence and thereafter prosecute with reasonable diligence drilling, deepening, repairing, redrilling or other operations for the restoration of production of oil, gas or sulfur from the leased lands. [1961 c.619 §15]
Section: Previous 274.805 274.810 274.815 274.820 274.825 274.830 274.835 274.840 274.845 274.850 274.855 274.860 274.865 274.867 274.885 NextLast modified: August 7, 2008