The Environmental Quality Commission shall determine the most cost-effective method of conducting a motor vehicle pollution control system inspection program as required by ORS 468A.365. Upon finding that savings to the public and increased efficiency would result and the quality of the program would be adequately maintained, the commission may contract with a unit of local government or with a private individual, partnership or corporation authorized to do business in the State of Oregon, for the performance of tests or other services associated with conducting a motor vehicle pollution control system inspection program. [Formerly 468.377]
Section: Previous 468A.327 468A.330 468A.350 468A.355 468A.360 468A.363 468A.365 468A.370 468A.375 468A.380 468A.385 468A.387 468A.390 468A.395 468A.400 NextLast modified: August 7, 2008