Oregon Statutes - Chapter 537 - Appropriation of Water Generally - Section 537.343 - Proposed final order; conditions.

(1) A proposed final order issued under ORS 537.170 (6) for an in-stream water right certificate may include any condition the Water Resources Director considers necessary, but which is consistent with the intent of ORS 537.332 to 537.360. The proposed final order may:

(a) Approve the in-stream water right for the quantity of water requested;

(b) Approve the requested in-stream water right for a lesser quantity of water; or

(c) Reject the requested in-stream water right.

(2) If the director reduces or rejects the in-stream water right as requested, or conditions the in-stream water right, the director shall include a statement of findings that sets forth the basis for the reduction, rejection or conditions. The director shall be the final authority in determining the level of in-stream flow necessary to protect the public use.

(3) After the director issues a final order approving an in-stream water right, the Water Resources Department shall issue a certificate for an in-stream water right according to the provisions of ORS 537.341. [1987 c.859 §7; 1995 c.416 §20]

Section:  Previous  537.332  537.334  537.335  537.336  537.338  537.340  537.341  537.343  537.345  537.346  537.348  537.349  537.350  537.352  537.354  Next

Last modified: August 7, 2008