(1) Any telecommunications utility may:
(a) Enter upon lands within this state for the purpose of examining, locating and surveying the line thereof and also other lands necessary and convenient for the purpose of construction of service facilities, doing no unnecessary damage thereby.
(b) Condemn such lands not exceeding 100 feet in width for its lines (including poles, towers, wires, supports and necessary equipment therefor) and in addition thereto, other lands necessary and convenient for the purpose of construction of service facilities.
(2) Notwithstanding subsection (1) of this section, any telecommunications utility may, when necessary or convenient for transmission lines (including poles, towers, wires, supports and necessary equipment therefor) designed for voltages in excess of 330,000 volts, condemn land not to exceed 300 feet in width. In addition, if the lands are covered by trees which are liable to fall and constitute a hazard to its wire or line, such telecommunications utility may condemn such trees for a width not exceeding 100 feet on either side of the condemned land, as may be necessary or convenient for such purpose.
(3) The proceedings for the condemnation of such lands shall be the same as that provided in ORS chapter 35, provided that any award shall include, but shall not be limited to, damages for destruction of forest growth, premature cutting of timber and diminution in value to remaining timber caused by increased harvesting costs. [1987 c.447 §69]
Section: Previous 759.045 759.050 759.052 759.054 759.056 759.058 759.060 759.075 759.080 759.100 759.105 759.110 759.115 759.120 759.125 NextLast modified: August 7, 2008